EnergyInfrastructure

Netherlands Grid Crisis: Renewable Energy Boom Creates 20,000-Connection Backlog, Costs Economy €35 Billion Annually

The Netherlands’ rapid renewable energy transition has created massive grid congestion, leaving 20,000 companies waiting for connections. Tennet plans €200 billion in grid upgrades as delays threaten Dutch industrial competitiveness.

Grid Congestion Reaches Crisis Levels

The Netherlands’ ambitious push toward renewable energy is creating severe electrical grid congestion that’s hampering economic growth and leaving thousands of companies in limbo, according to reports. Sources indicate that 8,000 companies are currently waiting to feed electricity into the grid, while another 12,000 are waiting for permission to increase their power consumption.